We are ready to move to our new/bigger lab space!
We will move out of room 257 and into 263. We will keep 263A (the microscope/tissue culture room) as it is. We will move things down from the third floor to room 257. We will only get the chemical hood and the partial bench in 257 for a limited time (until someone else needs the space).
The Kievit lab should be moved out of 263 by Monday. So I would like us to get things organized on Monday/Tuesday. On Tuesday we can organize the new lab space as a group. Then on Wednesday we can start moving things. We will get help on the actual move of large items, but if things are delicate we might want to move them ourselves.
Ivon – please organize everyone on Monday so that we can have a smooth move.
[signature_48073196] Nicole Iverson, Ph.D. Associate Professor
Department of Biological Systems Engineering Institute of Agriculture and Natural Resources College of Engineering University of Nebraska–Lincoln 260 Morrison Hall, 4240 Fair Street, Lincoln, NE 68583 Cell: 732-648-3319 | iverson@unl.edumailto:iverson@unl.edu| engineering.unl.edu/iversonlabhttp://engineering.unl.edu/iversonlab/